Hords Creek Project

This is an example of a turn-key project where the Housley Group constructed a new pump station building equipped with four 75-hp pumps, chlorination system, redundant back-up generators, microwave based alarm and control system and a 120 ft. water storage tank for the US Corps of Engineers.